Put Forth Effort

Built by Effort. Driven by Purpose.

Building power from the ground up.

Today’s session was built around one objective: develop lower-body strength while maintaining upper-body density and core durability. Heavy squats anchored the workout. Everything else supported that goal.

This is the type of training that builds real strength — not just aesthetics.


Cardio Preparation

  • Treadmill walk — 15 minutes
  • StairMaster — 30 minutes

Purpose: elevate heart rate, increase blood flow, and prep hips, knees, and ankles for loaded squats.


Core Activation (3 Rounds)

  • 12 Hanging med ball knee raises @ 8 lbs
  • 12 Hanging leg raises
  • 12 Back extensions @ 25 lbs
  • 12 Plate side bends @ 45 lbs

Core was trained first to reinforce bracing and stability before squats.


Lower Body Volume Block

Machine Hip Abduction

  • 25 × 55 lbs
  • 25 × 70
  • 25 × 100
  • 25 × 110
  • 25 × 130

Plate Goblet Squats

  • 5 sets × 10 reps @ 25 lbs

Single-Leg Extensions

  • 12 × 10 lbs
  • 12 × 15
  • 12 × 20
  • 12 × 20

Walking Lunges

  • 4 sets × 12 reps

Leg Extensions

  • 12 × 70 lbs
  • 12 × 80
  • 12 × 90
  • 12 × 100

Seated Leg Curls

  • 12 × 70 lbs
  • 12 × 80
  • 12 × 90
  • 12 × 100

Strength Anchor: Back Squats

  • 12 × 45 lbs
  • 10 × 135
  • 8 × 185
  • 5 × 225
  • 3 × 255
  • 3 sets × 3 reps @ 275

Heavy triples under control. Focus on depth, bracing, and bar speed.


Accessory & Finisher Work

Leg Press

  • 4 sets × 12 reps @ 298 lbs

Calf Raises on Leg Press

  • 4 sets × 12 reps @ 298 lbs

Dumbbell Around the Worlds

  • 3 sets × 12 reps @ 15 lbs

Barbell Curls

  • 5 sets × 12 reps @ 65 lbs

Alternating Dumbbell Hammer Curls

  • 4 sets × 12 reps @ 25 lbs

Dumbbell Hammer Curls

  • 4 sets × 12 reps @ 25 lbs

Cable Rope Triceps Extensions

  • 4 sets × 12 reps @ 80 lbs

Single-Arm Cable Triceps Pulldowns

  • 4 sets × 12 reps @ 20 lbs

Hanging Knee Raises

  • 4 sets × 12 reps

Training Takeaway

Heavy compound lifts build strength.
Volume builds muscle.
Consistency builds results.

This wasn’t about chasing numbers. It was about building a base that lasts.

Stack days.
Control the effort.
Put Forth Effort.

Posted in

Leave a comment